FPSO Polvo

FPSO Polvo

  

 
Main Contractors     Process and Storage Capacity  
Topside Module Design:     Oil Production Capacity: 90 Mbpd
   M46 ABB   Gas Compression Capacity: 8 MMscfd
   5 Other Modules Dynamac   Oil Handling Capacity: 91 Mbpd
Hull:  Prosafe   Gas Injection: 0 MMscfd 
Fabrication Yard     Water Injectiion: 100 Mbpd 
   Conversion/Integration: Keppel   Storage Capacity: 1,600 Mbbl 
   Conversion Year: 2007      
Turret Supplier/Swivel Manufacturer: Prosafe   Riser Information  
      Total Risers and Umbilicals: 9
Well Information     Production Risers:
Total Wells:     Water Injection Risers:
Production Wells:     Gas Injection Risers: 0
Gas Injection Wells:       Gas Lift Risers:
Water Injection Wells:     Import/Export Risers:
Tree Installation Type: Dry Tree   Other:
      Umbilicals:
Hull Information        
Classification: DNV GL   Topside Information  
 Dimensions:     Installed Power: 36 MWe 
   Length: 325 m   Power System Design 2 x Diahatsu 6DS-26
   Width: 55 m    

Diesel Engine

3 x Steam Turbines

   Depth: 28 m   Topside Module Weight:  8,312 t
Max operating draft: 17 m   LQ Capacity: 93 People
Hull Construction Type: Single Hull   LQ Location: Afterward
Deadweight: 257,865 t   Gas Deposition: Flared
Construction Type: Conversion   Type of Flare: Flare Tower
Original Hull Fabrication Year: 1980   Offloading System: Tandem
       Mooring System Type: Internal Turret
      Permanent or Disconnectable Mooring: Disconnectable
      Number of Anchor Legs: 6